F 150 2WD V8-4.6L (2008)
Sunroof / Moonroof Track: Service and Repair
Trough Assembly
TROUGH ASSEMBLY
Removal and Installation
NOTE: The roof opening panel motor must be initialized when repairs are carried out on any part of the roof opening panel, including: whenever the
roof opening panel motor has been removed from the roof opening panel assembly, a new roof opening panel motor has been installed or when a new
roof opening panel frame has been installed.
1. Remove the roof opening panel glass.
2. Remove the 2 trough guide retaining screws.
3. Remove the trough from the trough guide assembly.
4. To install, reverse the removal procedure.
-
Align the roof opening panel.
-
Initialize the roof opening panel motor.