F 150 2WD Pickup V8-4.6L VIN W (2006)
6. Tighten the bolts in the sequence shown.
^
Tighten to 10 Nm (89 inch lbs.).
7. Inspect the lead frame for damage.
^
Using the special tool, check all lead frame solenoid connections. The gauge should fit tightly and not fall out after being inserted.
^
If the special tool passes through any lead frame connector pins or does not feel like it makes a good contact, install a new lead frame.