F 150 4WD Pickup V8-5.4L CNG VIN M (2001)
6. Install the brake booster vacuum hose, bracket and nut.
Windsor engine (5.4L)
7. Install the EGR valve-to-exhaust manifold tube.
^
Tighten both fittings, starting at the top, in two stages.
^
Stage 1: Hand-tighten.
^
Stage 2: Tighten to 40 - 60 Nm (30 - 44 ft. lbs.).
^
Connect the differential pressure feedback EGR sensor hoses.
8. Install the brake booster vacuum hose, bracket and
All vehicles
9. Install the front fender splash shield.
10. On 4x4 vehicles, install the front wheel opening molding.
11. Lower the vehicle.