F 250 2WD Super Duty V10-6.8L (2009)
Installation
1. Assemble the main control valve body.
1. Install the PCA and install the E clip.
2. Push the transmission internal harness connector through the solenoid body and twist the connector, locking it into place.
3. Install the SSPCC back into place and install the E clip.
4. Connect the electrical connectors to the PCA and the SSPCC.
5. Install the wire harness to solenoid body and tighten the bolts.
2. Install the solenoid body electrical connector O-ring seal, lubricate it with transmission fluid.
3. Install the transmission main control valve body. For additional information, refer to Solenoid Body Assembly See: Valve Body/Service and
Repair.