F 250 2WD Super Duty V10-6.8L (2009)
-
Install a new yoke as necessary.
Assembly
Bearing cup installation
1. NOTE: Install the Universal Joint Kits as complete assemblies only. Do not mix components from other kits.
Install a new spider and bearing cup.
1. Start a new bearing cup in the shaft yoke.
-
Check the needle bearings for correct positioning.
2. Position the new spider in the shaft yoke.
3. Press the bearing cup to just below the snap ring groove.
2. NOTE: Use the yellow snap rings supplied in the kit to assemble the U-joint. If difficulty is encountered with the yellow snap rings, install the
black snap rings.
Remove the shaft from the C-Frame and Screw Installer/Remover, and install the new snap ring.
Opposite bearing cup installation
3. Repeat Bearing cup installation in this procedure to install the new bearing cup and snap ring on the opposite side of the shaft yoke.
4. Remove the shaft from the C-Frame and Screw Installer/Remover, and install the new snap ring.
5. NOTICE: Do not strike the bearings or damage to the component may occur.
Check the U-joint for freedom of movement.
-
If binding, strike the yoke with a brass or plastic hammer in the area indicated.