F 250 2WD Super Duty V8-6.0L DSL Turbo VIN P (2004)
1. Push the bulkhead connector through the transmission solenoid body, twist it to lock it in place.
2. Connect the internal wiring harness.
1
Install the two screws.
2
Connect the transmission fluid temperature sensor electrical connector.
3
Connect the pressure switch electrical connectors (if equipped).
4
Connect the solenoid electrical connectors.
3. NOTE: The O-ring must be installed in the top slot.
Install a new solenoid body bulkhead connector O-ring.