F 250 4WD Super Duty V8-5.4L SOHC VIN L (1999)
4. Connect the CMP electrical connection.
5. Install the bracket and the nut.
6. Install the bracket.
7. Install (A) the belt idler pulley and (B) tighten the bolt.
4. Connect the CMP electrical connection.
5. Install the bracket and the nut.
6. Install the bracket.
7. Install (A) the belt idler pulley and (B) tighten the bolt.