F 350 2WD Super Duty V8-5.4L VIN 5 (2006)
Part 2
Removal and Installation
1. Disconnect the battery.
2. Remove the screw and position the battery ground cable terminal aside.
-
To install, tighten to 10 Nm (89 lb-in).
3. Remove the bolt and position the battery cable harness bracket aside.
-
To install, tighten to 9 Nm (80 lb-in).
4. Remove the nut and position the battery ground cable terminal aside.
-
To install, tighten to 12 Nm (9 lb-ft).
5. Remove the stud nut and position the battery ground cable eyelet aside.
-
To install, tighten to 40 Nm (30 lb-ft).
6. Remove the nut and position the starter solenoid wire terminal aside.
-
To install, tighten to 5 Nm (44 lb-in).
7. Remove the nut and position the starter solenoid positive cable terminal aside.
-
To install, tighten to 12 Nm (9 lb-ft).
8. Remove the nut and position the generator B+ cable terminal and the CJB cable terminal aside.
-
To install, tighten to 8 Nm (71 lb-in).
9. Disconnect the starter relay electrical connector.
10. Remove the battery cable assembly.
11. To install, reverse the removal procedure.