F 350 2WD Super Duty V8-6.0L DSL Turbo VIN P (2004)
7. Install the turbocharger heat shield and the nuts.
All vehicles
8. Slide the EGR cooler hose forward and rotate flat to lock.
9. Install the fuel line.
^
Install new sealing washers.
^
Install the fuel line.
^
Install the banjo fitting and the bolt.
10. Install the oil filter return tube and bolt.
^
On new oil filter return tubes, tighten to 6 Nm (53 inch lbs.).
^
On used oil filter return tubes, tighten to 3 Nm (27 inch lbs.).