F 350 2WD Super Duty V8-6.4L DSL Turbo (2009)
20. Position a new vertical EGR cooler gasket and install the stud.
-
Tighten to 31 Nm (23 lb-ft).
21. Install the nut and bolt for the vertical EGR cooler.
-
Tighten to 31 Nm (23 lb-ft).
Late build vehicles
22. Connect the hose to the EGR cooler.
23. Connect the EGRT sensor electrical connector.
Early build vehicles
24. Install the retaining clip and retaining nut on the stud.
-
Tighten to 12 Nm (106 lb-in).
25. Connect the EGRT sensor electrical connector. Connect the EGR cooler hose and connect to the retaining clips.
-
Tighten to 4 Nm (35 lb-in).