PINPOINT TEST A : DAYTIME RUNNING LAMPS INOPERATIVE |
TEST CONDITIONS | DETAILS/RESULTS/ACTIONS |
A1: DETERMINE THE FAULT CONDITION |
NOTE:Set the headlamp switch to OFF |
| 1 Ignition switch in position II. |
| 2 Check the operation of the daytime running lamp (DRL) parking lamps, DRL dipped beam and DRL license plate lamps. |
| Are the DRL dipped beam, DRL parking lamps and DRL license plate lamps inoperative? Yes - DRL parking lamps, DRL dipped beams and the DRL license plate lamps are inoperative, vehicles built before 08/2005: GO to A2. - DRL parking lamps, DRL dipped beams and the DRL license plate lamps are inoperative, vehicles built after 08/2005: GO to A4. No - DRL parking lamps and DRL license plate lamps are inoperative: GO to A9. |
A2: CHECK FUSE F40 (10 A) (CJB). |
| 1 Ignition switch in position 0. |
| 2 Disconnect fuse F40 (10 A) (CJB). |
| 3 CHECK fuse F40 (10 A) (CJB). |
| Is the fuse OK? Yes No RENEW fuse F40 (10 A) (CJB) and CHECK the operation of the system. If the fuse blows again, LOCATE and RECTIFY the short to ground using the Wiring Diagrams. CHECK the operation of the system. |
A3: CHECK THE VOLTAGE SUPPLY TO FUSE F40 (10 A) (CJB) |
| 1 Connect fuse F40 (10 A) (CJB). |
| 2 Ignition switch in position II. |
| 3 Measure the voltage between fuse F40 (10 A) and ground. |
| Does the meter display battery voltage? Yes CHECK and if necessary INSTALL A NEW CJB. CHECK the operation of the system. No LOCATE AND RECTIFY the break in the voltage supply of fuse F40 (10A) (CJB) using the Wiring Diagrams. CHECK the operation of the system. |
A4: CHECK FUSE F31 (10 A) (CJB). |
| 1 Ignition switch in position 0. |
| 2 Disconnect fuse F31 (10 A) (CJB). |
| 3 CHECK fuse F31 (10 A) (CJB). |
| Is the fuse OK.? Yes No RENEW fuse F31 (10 A) (CJB) and CHECK the operation of the system. If the fuse blows again, LOCATE and RECTIFY the short to ground using the Wiring Diagrams. CHECK the operation of the system. |
A5: CHECK THE VOLTAGE SUPPLY TO FUSE F31 (10 A) (CJB) |
| 1 Connect fuse F31 (10 A) (CJB). |
| 2 Ignition switch in position II. |
| 3 Measure the voltage between fuse F31 (10 A) (CJB) and ground. |
| Does the meter display battery voltage? Yes No LOCATE AND RECTIFY the break in the voltage supply of fuse F31 (10A) (CJB) using the Wiring Diagrams. CHECK the operation of the system. |
A6: CHECK THE VOLTAGE SUPPLY OF THE AUTOMATIC HEADLAMPS RELAY - LOAD CURRENT CIRCUIT, FOR OPEN CIRCUIT |
| 1 Ignition switch in position 0. |
| 2 Disconnect Automatic headlamps relay from socket C418. |
| 3 Ignition switch in position II. |
| 4 Measure the voltage between the automatic headlamps relay, socket C418, pin 3, circuit 15-LE29A (GN/BK), socket side and ground. |
| Does the meter display battery voltage? Yes No LOCATE and RECTIFY the break in the circuits between fuse F31 (10 A) (CJB) and the automatic headlamps relay using the Wiring Diagrams. CHECK the operation of the system. |
A7: CHECK THE VOLTAGE SUPPLY OF THE AUTOMATIC HEADLAMPS RELAY - CONTROL CIRCUIT, FOR OPEN CIRCUIT |
| 1 Measure the voltage between the automatic headlamps relay, socket C418, pin 1, circuit 15-LE36 (GN/WH), socket side and ground. |
| Does the meter display battery voltage? Yes No LOCATE and RECTIFY the break in the circuit between soldered connection S1 and the automatic headlamps relay using the Wiring Diagrams. CHECK the operation of the system. |
A8: CHECK THE GROUND CONNECTION OF THE AUTOMATIC HEADLAMPS RELAY FOR OPEN CIRCUIT |
| 1 Ignition switch in position 0. |
| 2 Measure the resistance between the automatic headlamps relay, socket C418, pin 2, circuit 31-LE36 (BK), socket side and ground. |
| Is a resistance of less than 2 ohms registered? Yes RENEW the automatic headlamps relay. CHECK the operation of the system. No LOCATE and RECTIFY the break in the circuit between soldered connection S15 and the automatic headlamps relay using the Wiring Diagrams. CHECK the operation of the system. |
A9: CHECK CIRCUIT 15-LE32 (GN/WH) FOR OPEN CIRCUIT |
| 1 Ignition switch in position 0. |
| 2 Disconnect headlamp switch from connector C338. |
| 3 Ignition switch in position II. |
| 4 Measure the voltage between the headlamp switch C338, pin 15, circuit 15-LE32 (GN/WH), wiring harness side and ground. |
| Does the meter display battery voltage? Yes No - Vehicles built before 08/2005: LOCATE and RECTIFY the break in the circuit between fuse F40 (10A) (CJB) and the headlamp switch using the Wiring Diagrams. CHECK the operation of the system. - Vehicles built after 08/2005: LOCATE and RECTIFY the break in the circuit between the automatic headlamps relay and the headlamp switch using the Wiring Diagrams. CHECK the operation of the system. |
A10: CHECK THE HEADLAMP SWITCH |
| 1 Ignition switch in position 0. |
| 2 Connect a fused jumper wire (10 A) at the headlamp switch, connector C338, between pin 15, circuit 15-LE32 (GN/WH) and pin 13, circuit 29S-DB8 (OG/BU), wiring harness side. |
| 3 Ignition switch in position II. |
| 4 CHECK parking lamps. |
| Do the parking lamps illuminate? Yes INSTALL A NEW headlamp switch. CHECK the operation of the system. No LOCATE and RECTIFY the break in the circuit between the headlamp switch and bridge (CJB) using the Wiring Diagrams. CHECK the operation of the system. |
A11: CHECK THE VOLTAGE SUPPLY OF THE HEADLAMP SWITCH |
| 1 Ignition switch in position II. |
| 2 OPERATE headlamp flasher. |
| 3 CHECK the headlamp. |
| Is headlamp flasher working? Yes No - Vehicles built before 08/2005: LOCATE and RECTIFY break in circuit 15-LE29 (GN/BK), between fuse F40 (10 A) (CJB) and headlamp switch using the Wiring Diagrams. CHECK the operation of the system. - Vehicles built after 08/2005: LOCATE and RECTIFY break in circuit 15-LE29 (GN/BK), between the automatic headlamps relay and the headlamp switch using the Wiring Diagrams. CHECK the operation of the system. |
A12: CHECK FUSE F19 (15 A) (CJB). |
| 1 Ignition switch in position 0. |
| 2 Disconnect fuse F19 (15 A) (CJB). |
| 3 CHECK fuse F19 (15 A) (CJB). |
| Is the fuse OK? Yes No RENEW fuse F19 (15 A) (CJB) and check the operation of the system. If the fuse blows again, LOCATE and RECTIFY the short to ground using the Wiring Diagrams. CHECK the operation of the system. |
A13: CHECK THE VOLTAGE SUPPLY TO FUSE F19 (15 A) (CJB) |
| 1 Connect fuse F19 (15 A) (CJB). |
| 2 Ignition switch in position II. |
| 3 Measure the voltage between fuse F19 (15 A) (CJB) and ground. |
| Does the meter display battery voltage? Yes No RECTIFY the break in the voltage supply of fuse F19 (15 A) (CJB) using the Wiring Diagrams. CHECK the operation of the system. |
A14: CHECK FUSE F11 (15 A) (CJB). |
| 1 Ignition switch in position 0. |
| 2 Disconnect fuse F11 (15 A) (CJB). |
| 3 CHECK fuse F11 (15 A) (CJB). |
| Is the fuse OK? Yes No RENEW fuse F11 (15 A) (CJB) and check the operation of the system. If the fuse blows again, LOCATE and RECTIFY the short to ground using the Wiring Diagrams. CHECK the operation of the system. |
A15: CHECK THE HEADLAMP SWITCH |
| 1 Ignition switch in position 0. |
| 2 Connect fuse F11 (15 A) (CJB). |
| 3 Disconnect headlamp switch from connector C338. |
| 4 Connect a fused jumper wire (10 A) to the headlamp switch, connector C338, between pin 8, circuit 15-LE29 (GN/BK)/15-LE14 (GN/RD) and pin 4, circuit 15S-LE6 (GN/YE), wiring harness side. |
| 5 Ignition switch in position II. |
| 6 CHECK the DRL dipped beam. |
| Does the DRL dipped beam illuminate? Yes INSTALL A NEW headlamp switch. CHECK the operation of the system. No |
A16: CHECK VOLTAGE SUPPLY OF DRL RELAY - LOAD CURRENT CIRCUIT - FOR OPEN CIRCUIT |
| 1 Ignition switch in position 0. |
| 2 Connect Headlamp switch to connector C338. |
| 3 Disconnect DRL relay from socket C409. |
| 4 Ignition switch in position II. |
| 5 Measure the voltage between the DRL relay, socket C409, pin 3, circuit 29-LE7 (OG/BU), socket side and ground. |
| Does the meter display battery voltage? Yes No LOCATE and RECTIFY the break in the circuit between fuse F19 (15A) (CJB) and the DRL relay using the Wiring Diagrams. CHECK the operation of the system. |
A17: CHECK VOLTAGE SUPPLY OF DRL RELAY - CONTROL CIRCUIT - FOR OPEN CIRCUIT |
| 1 Measure the voltage between the DRL relay, socket C409, pin 1, circuit 15S-LE6 (GN/YE), socket side and ground. |
| Does the meter display battery voltage? Yes No LOCATE and RECTIFY the break in the circuit between the headlamp switch and DRL relay (DRL) using the Wiring Diagrams. CHECK the operation of the system. |
A18: CHECK THE GROUND CONNECTION TO THE DRL RELAY FOR OPEN CIRCUIT |
| 1 Ignition switch in position 0. |
| 2 Measure the resistance between the DRL relay, socket C409, pin 2, circuit 31-LE6 (BK), socket side and ground. |
| Is a resistance of less than 2 ohms registered? Yes No LOCATE and RECTIFY the break in the circuit between the DRL relay and soldered connection S15 using the Wiring Diagrams. CHECK the operation of the system. |
A19: CHECK THE DRL RELAY |
| 1 Using a fused jumper wire (15 A) at the daytime running lamp relay, connect socket C409, pin 3 circuit 29-LE7 (OG/BU) and pin 5, circuit 15S-LE8B (GN/RD), socket side. |
| 2 Ignition switch in position II. |
| 3 CHECK the DRL dipped beam. |
| Does the DRL dipped beam illuminate? Yes INSTALL A NEW DRL relay. CHECK the operation of the system. No |
A20: CHECK THE VOLTAGE SUPPLY TO FUSE F11 (15 A) (CJB) |
| 1 Ignition switch in position 0. |
| 2 Connect DRL relay to socket C409. |
| 3 Ignition switch in position II. |
| 4 Measure the voltage between fuse F11 (15 A) (CJB) and ground. |
| Does the meter display battery voltage? Yes CHECK and if necessary RENEW the CJB. CHECK the operation of the system. No RECTIFY the break in circuit(s) 15S-LE8B (GN/RD), 15S-LE8A (DRL resistor (GN/RD)) or 15S-LE8 (GN/RD) between the DRL relay and fuse F11 (15 A) (CJB) using the Wiring Diagrams. CHECK the operation of the system. |