Side panel and lamp mounting panel and back panel with reinforcement are already removed before the start of repairs.
The cut may vary depending on damage.
Water drain panel reinforcement
Mill out the spot welds.
Water drain panel reinforcement
Separating cut.
Mill out the spot welds.
Installation
NOTE:The instructions concerning welding equipment given in Section 501-25A must be observed before resistance spot welding body panels with a total thickness of 3 mm and greater.