Page 46
background image

-

corrosion

-

damaged pins

-

pushed-out pins

-

Connect the LTM connector and make sure it seats correctly.

-

Operate the system and verify the concern is still present.

-

Is the concern still present?

Yes

INSTALL a new LTM. REFER to Doors, Hood and Trunk. CLEAR the DTCs. REPEAT the network test with the scan tool.

No

The system is operating correctly at this time. The concern may have been caused by a loose or corroded connector.

-------------------------------------------------

 

Pinpoint Test R: The Smart Junction Box (SJB) Does Not Respond To The Scan Tool

Communications Network

Pinpoint Tests

Pinpoint Test R: The Smart Junction Box (SJB) Does Not Respond To The Scan Tool

Refer to Wiring Diagram Set 10, Grounds for schematic and connector information.  See: Diagrams/Electrical Diagrams/Diagrams By Number

Refer to Wiring Diagram Set 13, Power Distribution/SJB for schematic and connector information.  See: Diagrams/Electrical Diagrams/Diagrams By
Number

Refer to Wiring Diagram Set 14, Module Communications Network for schematic and connector information.  See: Diagrams/Electrical
Diagrams/Diagrams By Number

Normal Operation

The Smart Junction Box (SJB) communicates with the scan tool through the Medium Speed Controller Area Network (MS-CAN).

This pinpoint test is intended to diagnose the following:

-

Fuse

-

Wiring, terminals or connectors

-

SJB

 

PINPOINT TEST R: THE SJB DOES NOT RESPOND TO THE SCAN TOOL

NOTICE:  Use the correct probe adapter(s) when making measurements. Failure to use the correct probe adapter(s) may damage the
connector.

NOTE:  Failure to disconnect the battery when instructed will result in false resistance readings. Refer to Battery.

-------------------------------------------------
R1 CHECK THE SJB VOLTAGE SUPPLY CIRCUIT FOR AN OPEN

 

-

Ignition ON.

-

NOTE: Measurements are taken with the fuses installed.

-

Measure the voltage between the SJB fuse 5 (10A) and ground.

Initial Inspection and Diagnostic Overview|Page 2914 > < Initial Inspection and Diagnostic Overview|Page 2912