Diagnosis and Testing Description of operation Configuration of a new module is performed using WDS. In doing so, the same system requirements must apply as for the diagnosis of the respective module: - The BUS connection between the module and WDS must be in order.
- The voltage supply to the module and to WDS must be guaranteed.
For this reason, if there are communication problems which cannot be attributed to the incorrect software version in WDS, the system test for module communication of the particular module must be performed. For further information, refer to REFER to Section 418-00 Module Communications Network. |