Fusion FWD L4-2.3L VIN Z (2007)
^
Stage 1: Tighten to 55 Nm (41 ft. lbs.).
^
Stage 2: Tighten to 55 Nm (41 ft. lbs.).
4. Install the 2 catalytic converter manifold shield bracket bolts and the bracket.
^
Tighten to 20 Nm (15 ft. lbs.).
5. Tighten the 2 catalytic converter manifold bracket bolts.
^
Tighten to 20 Nm (15 ft. lbs.).
6. Position the heat shield and install the 6 heat shield bolts.
^
Tighten to 10 Nm (89 inch lbs.).
7. Install the 2 catalytic converter manifold-to-exhaust flexible pipe nuts.
^
Install a new gasket.
^
Tighten to 40 Nm (30 ft. lbs.).
8. Position the wiring harness bracket on the stud.
9. Install the heated oxygen sensor (HO2S) and catalyst monitor sensors (CMS).
10. Install the generator air inlet duct.