Mustang V8-4.6L (2009)
12. NOTICE: When installing the pressure and return lines to the steering gear, make sure the lines are fully seated into the steering gear
prior to installing the clamp plate. Additionally, make sure that the clamp plate surfaces are free of foreign material. DO NOT exceed the
specified torque when tightening the clamp plate. Leakage and/or failure of the power steering components may occur.
NOTE: New O-ring seals must be installed any time the lines are disconnected from the steering gear.
Remove the power steering line clamp plate bolt, rotate the clamp plate and remove the power steering pressure line.
-
Discard the O-ring seal.
-
To install, tighten to 23 Nm (17 lb-ft).
13. To install, reverse the removal procedure.
NOTE: New Teflon(R) seals must be installed.
Using the Teflon(R) Seal Installer Set, install a new Teflon(R) seal to the pressure line fitting.
14. For additional information on the accessory drive belt routing, refer to Drive Belts, Mounts, Brackets and Accessories.
-
Fill the power steering system.