Ranger 2WD V6-3.0L (2008)
5. Install the push rods.
6. Tighten the rocker arm bolts.
^
Tighten to 32 Nm (24 lb-ft).
7. Connect the fuel tube.
8. Connect the fuel injector electrical connectors.
9. Connect the CKP sensor electrical connector and attach the wiring retainer to the stud bolt.
10. Connect the ECT sensor electrical connector.
11. Connect the upper radiator hose, heater hose and coolant bypass hose.
12. Install both valve covers.
13. Fill and bleed the engine cooling system.