ford Workshop Repair Guides

Ford Workshop Service and Repair Manuals

Initial Inspection and Diagnostic Overview|Page 2007 > < Initial Inspection and Diagnostic Overview|Page 2005
Page 17
background image

-

Is DLC pin 7 OK?

Yes

GO to G2.

No

REPAIR the DLC as necessary. CLEAR the DTCs. REPEAT the network test with the scan tool.

-------------------------------------------------
G2 CHECK THE ISO 9141 CIRCUIT BETWEEN THE ABS MODULE AND THE DLC FOR AN OPEN

-

Disconnect: ABS Module C135.

-

Measure the resistance between the ABS module C135-16, circuit VDB10 (GY), harness side and the DLC C251-7, circuit VDB10 (GY), harness
side.

-

Is the resistance less than 5 ohms?

Yes

GO to G3.

No

REPAIR the circuit. CLEAR the DTCs. REPEAT the network test with the scan tool.

-------------------------------------------------
G3 CHECK THE ISO 9141 NETWORK FOR A SHORT TO GROUND

-

Measure the resistance between the DLC C251-7, circuit VDB10 (GY), harness side and ground.

-

Is the resistance greater than 10,000 ohms?

Yes

GO to G4.

No

REPAIR the circuit. CLEAR the DTCs. REPEAT the network test with the scan tool.

Initial Inspection and Diagnostic Overview|Page 2007 > < Initial Inspection and Diagnostic Overview|Page 2005