Taurus V6-182 3.0L DOHC SHO (1992)
REMOVAL
1.
Disconnect negative battery cable.
2.
Raise the vehicle on hoist.
3.
Loosen hose clamp at cooler. Disconnect line and drain fluid in a suitable container.
4.
Remove the shift linkage mount bracket from transaxle.
5.
Cut tie straps and remove heat shield around steering gear assembly.
6.
Lower vehicle.
7.
Loosen hose clamp at reservoir and disconnect return line.
8.
Remove the line from vehicle.
INSTALLATION
1.
Position line in vehicle.
2.
Connect hose to reservoir and tighten clamp to 13-17 lb. in. (1.4 - 2.0 Nm).
3.
Raise vehicle.
4.
Position heat shield around steering gear assembly and install tie straps.
5.
Install shift linkage mount bracket to transaxle.
6.
Connect line to cooler and tighten clamp to 13-17 lb. in. (1.4-2.0 Nm).
7.
Lower vehicle.
8.
Connect negative battery cable.
9.
Fill system, See: Power Steering Bleeding/Service and Repair
Steering Gear to Cooler Line Replace