ford Workshop Repair Guides

Ford Workshop Service and Repair Manuals

Cleaning|Page 3112 > < Cleaning|Page 3110
Page 3
background image

17. Lift and remove upper intake manifold from lower intake manifold.
18. Discard intake manifold upper gasket.
19. If required, remove degas tube from the upper intake manifold.
20. If required, remove EGR valve, EGR backpressure transducer and EGR vacuum regulator solenoid.
21. If required, remove the throttle body from the upper intake manifold. Refer to Powertrain Management.
22. If required, remove the idle air control valve. Refer to Powertrain Management.

INSTALLATION 

CAUTION: Use care when cleaning gasket material because aluminum gouges easily which forms leak paths.

NOTE: Lightly oil all bolt and stud bolt threads prior to installation.

1. Clean and inspect sealing surfaces of intake manifold and throttle body.
2. Install guide pins (if available).
3. If removed, install idle air control valve to the upper intake manifold.
4. If removed, install the throttle body to the upper intake manifold.
5. If removed, install the EGR valve, EGR backpressure transducer and EGR vacuum regulator solenoid.
6. If removed, install degas tube to the upper intake manifold. Tighten retaining bolts to 8-12 Nm (71-106 inch lbs.).
7. Place intake manifold upper gasket on lower intake manifold.
8. Aligning bolt holes, install upper intake manifold on lower intake manifold. Install stud bolts and retaining bolts. Tighten to 20-30 Nm (15-22 ft.

lbs.).

9. Install generator brace to upper intake manifold mounting stud and generator mounting bracket. Tighten nut and bolts to 12-20 Nm (9-14 ft. lbs.).

10. Install intake manifold support to the throttle body and RH cylinder head. Tighten retaining bolts as shown in the illustration.
11. Install the engine control sensor wiring bracket onto the throttle body retaining stud bolts.
12. Connect crankcase ventilation tube, aspirator vacuum supply hose and evaporative emission return tube to fittings underneath upper intake

manifold.

13. Install EGR valve to exhaust manifold tube to EGR valve. Tighten to 35-65 Nm (26-47 ft. lbs.).
14. Connect vacuum hose to fuel pressure regulator.
15. Connect engine control sensor wiring connections to idle air control valve, throttle position sensor, EGR backpressure transducer and EGR

vacuum regulator solenoid.

16. Install accelerator cable bracket to side of throttle body. Tighten retaining bolts to 17 Nm (13 ft. lbs.).
17. Connect accelerator cable and speed control actuator cable to throttle body lever. Install accelerator retracting spring.
18. Install accelerator cable shield. Tighten bolts to 1.4 Nm (13 inch lbs.).
19. Install air cleaner outlet tube. Refer to Powertrain Management.
20. Connect battery ground cable. Refer to Starting and Charging.
21. Fill engine cooling system.
22. Start engine and check for vacuum and exhaust leaks.

NOTE: This adjustment must be performed if the throttle body is removed for any reason and if throttle plate idle adjustment screw position is
changed.

23. Check engine idle. Adjust as necessary. Refer to Powertrain Management.

Removal

Cleaning|Page 3112 > < Cleaning|Page 3110