Thunderbird V8-281 4.6L SOHC (1994)
Vacuum Tank: Testing and Inspection
Vacuum Reservoirs
Apply initial vacuum of 15 to 20".
Vacuum loss should not exceed 0.5" in 60 seconds.
If it does, replace the reservoir.
Vacuum Tank: Testing and Inspection
Vacuum Reservoirs
Apply initial vacuum of 15 to 20".
Vacuum loss should not exceed 0.5" in 60 seconds.
If it does, replace the reservoir.