geo Workshop Repair Guides

Geo Workshop Service and Repair Manuals

Throttle Cable/Linkage|Adjustments|Page 2010 > < Throttle Body|Specifications|Page 2006
Page 1
background image

Throttle Cable/Linkage: Adjustments

ACCELERATOR CABLE ADJUSTMENT

Accelerator Cable Adjustment

PROCEDURE:

1.

Check accelerator cable for end play.

2.

Cable end play should be within specification when the accelerator pedal is released and the engine is NOT operating. 
Accelerator cable end play specification:  10-15 mm (0.4-0.6 in.).

3.

If not within specification, adjust by loosening the lock nut. Be sure to tighten lock nut securely after adjustment is made.

NOTE:  Cable end play should be 3-5 mm (0.12-0.20 in.) when the throttle valve is in the idle position with the engine operating.

KICK-DOWN CABLE ADJUSTMENT
(FOR A/T VEHICLES)

*** This article updated by TSB # 91-86-7A October. 1990

Kick-down Cable Adjustment Figure 1

PROCEDURE:

1.

Make sure that the accelerator cable end play is within specification.

2.

Loosen the kick-down cable lock nut and adjusting nut considerably. (See illustration).

3.

With the aid of a second technician fully depress the accelerator pedal, pull the kick-down tight, in direction A. See illustration (figure 1).

4.

Turn the lock nut to within 1 mm (0.039 in.) of the cable bracket while the cable is being pulled tight.

Throttle Cable/Linkage|Adjustments|Page 2010 > < Throttle Body|Specifications|Page 2006