gmc Workshop Repair Guides

GMC Workshop Service and Repair Manuals

Secondary Air Injection Check Valve/Pipe Replacement - Bank 1|Page 6592 > < Secondary Air Injection Check Valve/Pipe Replacement - Bank 1|Page 6590
Page 3
background image

2. Install the AIR pipe and gasket.

3. Install the AIR pipe assembly bolts.

Tighten
Tighten the mounting bolts to 25 N.m (18 lb ft).
Tighten the AIR pipe assembly retainer bolt to 40 N.m (30 lb ft).

Secondary Air Injection Check Valve/Pipe Replacement - Bank 1|Page 6592 > < Secondary Air Injection Check Valve/Pipe Replacement - Bank 1|Page 6590