gmc Workshop Repair Guides

GMC Workshop Service and Repair Manuals

Deployment Procedures|Page 13096 > < Deployment Procedures|Page 13094
Page 10
background image

14. Secure and insulate the connection using electrical tape.

15. Twist together, bend, and tape the remaining connector wire lead to the remaining deployment wire.
16. Connect the deployment harness to the inflatable restraint steering wheel module yellow 2-way connector.

17. Route the deployment harness out of the vehicle's driver side.

18. Disconnect the driver side air bag yellow 2-way connector (1) from the vehicle wiring harness (2) located under the driver seat.

19. Cut the two side impact air bag wires leading to the yellow 2-way harness connector, leaving at least 16 cm (6 in) of wire at the connector.
20. Strip 13 mm (0.5 in) of insulation from each of the side impact air bag connector wire leads.

Deployment Procedures|Page 13096 > < Deployment Procedures|Page 13094