7. Remove the retaining ring from the quick connect fitting. 
8. Discard the retaining ring. 

9. Pull the cooler line straight out from the quick connect fitting. 

10. Remove the retaining ring (E-clips) securing the cooler line to the quick connect in order to remove the remaining cooler lines from the remaining

quick connect fittings. 

11. Remove the cooler lines from the vehicle. 

Installation Procedure 

1. Install the transmission oil cooler line to the vehicle. 

Important:Do not reuse any of the existing oil lines or oil lines fittings if there is excessive corrosion.Do not reuse any of the existing retaining
rings that were removed from the existing quick connect fittings. All retaining rings being installed must be new. Ensure the following
procedures are performed when installing the new retaining rings onto the fittings.
 

2. Install a new retaining ring (E-clip) into the quick connect fitting using the following procedure:

3. Hook one of the open ends of the retaining ring in one of the slots in the quick connect fitting. 

A/T - Revised Converter Check Valve/Cooler Line Fitting|Page 5282 > < A/T - Revised Converter Check Valve/Cooler Line Fitting|Page 5280