gmc Workshop Repair Guides

GMC Workshop Service and Repair Manuals

Second Design Connecting Rod Bolt & Torques|Page 3003 > < Connecting Rod Bearing - Clearance Checking Tool|Page 2998
Page 1
background image

Connecting Rod: Specifications
Second Design Connecting Rod Bolt & Torques

Bulletin No.: 99-06-01-011

Date: June, 1999

SERVICE MANUAL UPDATE

Subject:
Second Design Connecting Rod Bolt and Torque Specification 

This bulletin is being issued to revise the Fastener Tightening Specifications and the Piston, Connecting Rod, and Bearing Installation procedures. A
second design connecting rod bolt will be introduced for the 1999 model year. Either design bolt, (when used in pairs and properly tightened) may be
used with 1997-99 connecting rods. Add the second design bolt description and torque specifications to the appropriate Service information.

Identify the type of connecting rod bolt.

^

The first design connecting rod bolt (1) can be identified by a single dimple/mark on the head of the bolt and no retaining sleeve (3) on the bolt
shank.

^

The second design connecting rod bolt (2) can be identified by two dimples/marks on the head of the bolt and a retaining sleeve (3) on the bolt shank.

Important

When replacing the connecting rod bolts, both bolts MUST be of the same design for each connecting rod assembly. The use of different design
connecting rod bolts on the same connecting rod may lead to uneven clamp-loads and/or connecting rod bearing bore distortion.

Install the bearing, cap, and bolts. 

Tighten

^

Tighten the first design bolts:

First pass evenly to 20 Nm (15 lb ft). Final pass to 60 degrees using the J 36660.

Second Design Connecting Rod Bolt & Torques|Page 3003 > < Connecting Rod Bearing - Clearance Checking Tool|Page 2998