gmc Workshop Repair Guides

GMC Workshop Service and Repair Manuals

Customer Interest:|677147 > < A/T - Loss of 4th Gear/Busy 3-4 Shifting/TCC Cycling
Page 2
background image

1.

Remove the solenoid from the control valve body. Refer to the Service Manual for the proper procedure.

2.

Clamp a piece of 1/2 inch I.D. rubber hose over the fluid inlet end of the solenoid.

3.

Connect a wire from one of the solenoid terminals to the negative terminal (ground) of a battery.

4.

Apply compressed air to the rubber hose. Do not use air pressure in excess of 120 psi. Excessive pressure will not allow the check ball to seat
properly.

5.

Connect a wire from the other solenoid to the positive terminal (12 volts) of the battery.

6.

Observe the air flow through the solenoid. Replace the solenoid if there is an air leak when the solenoid is energized.

Parts Information

New Part Number

Description

10478140

1-2 & 3-4 Shift Solenoid (black)

10478141

2-3 Shift Solenoid (white)

Parts are currently available through GMSPO. 

Warranty Information

For vehicles repaired under warranty, use the table.

Customer Interest:|677147 > < A/T - Loss of 4th Gear/Busy 3-4 Shifting/TCC Cycling