gmc Workshop Repair Guides

GMC Workshop Service and Repair Manuals

Deployment Procedures|Page 13793 > < Deployment Procedures
Page 2
background image

8. Place the module with the vinyl trim cover facing up and away from the surface on a work bench.

9. Clear a space on the ground about 85 meters (6 ft) in diameter for deployment of the module. If possible, use a paved, outdoor location free of

activity. Otherwise, use a space free of activity on the shop floor. Make sure you have sufficient ventilation.

10. Make sure no loose or flammable objects are in the area.
11. Place the J39401-B SIR Deployment Fixture in the center of the cleared area.
12. Fill the fixture's plastic reservoir with water or sand.

13. Secure the J 39401-7A arms (5) to the deployment fixture (2) using carriage bolts (3) and nuts (4).
14. Mount the module (1) in the SIR deployment fixture (2) with the vinyl trim cover facing up using one of the following mounting methods.

IMPORTANT:  Securely hand tighten at fasteners prior to deployment.

15. To mount, use four M 6 bolts (6), nuts (8), and washers (7) in order to secure the module (1) to the deployment fixture (2).

Deployment Procedures|Page 13793 > < Deployment Procedures