gmc Workshop Repair Guides

GMC Workshop Service and Repair Manuals

Deployment Procedures|Page 13806 > < Deployment Procedures|Page 13804
Page 15
background image

45. Cut two 6.1 m (20 ft) deployment wires from a 0.8 mm (18 gage) or thicker multi-strand wire. Use these wires to fabricate the deployment

harness.

46. Strip 13 mm (0.5 in) of insulation from both ends of the wires cut in the previous step.
47. Twist together one end from each of the wires in order to short the wires. Deployment wires shall remain shorted, and not connected to a power

source until you are ready to deploy the side air bag module.

48. Twist together one connector wire lead to one deployment wire.
49. Inspect that the previous connection is secure.

50. Bend flat the twisted connection.
51. Secure and insulate the connection using electrical tape.

Deployment Procedures|Page 13806 > < Deployment Procedures|Page 13804