Savana 2500 V8-6.6L DSL Turbo (2008)
1. Install the junction block base by sliding tabs (2) in and pressing in tabs (1) until they are locked.
2. Install into the junction block base the Chassis Harness (1), the I/P Harness (2), the Engine Harness (3), and the Forward LP Harness (4).