Savana 2500 V8-6.6L DSL Turbo (2008)
![background image](/gmc/savana_2500/v8-6.6l_dsl_turbo/Page-1618002.png)
6. Remove the 1-2 and 2-3 shift solenoid retainers.
7. Remove the 1-2 and 2-3 shift solenoids.
8. Remove the 3-2 control solenoid retainer.
9. Remove the 3-2 control solenoid.
Installation Procedure
1. Install the 3-2 control solenoid.
2. Install the 3-2 control solenoid retainer.
3. Install the 1-2 and 2-3 shift solenoids.
4. Install the 1-2 and 2-3 shift solenoid retainers.