Savana 2500 V8-6.6L DSL Turbo VIN 6 (2007)
24. Remove the eight checkballs (nine checkballs for some models).
Installation Procedure
1. Install the 8 checkballs (9 checkballs for some models) into the control valve body.
*
The checkball marked as number 2, is used on RCP, RDP, ZJP and ZLP models only
*
To hold the checkballs in place, use the J 36850 .
2. Install the PWM screen into the control valve body.
3. Install a new manual 2-1 band servo piston seal (2) onto the manual 2-1 band servo piston (3).
4. Install the manual 2-1 band servo piston pin (1) into the manual 2-1 band servo piston (3).
5. Install the manual 2-1 band servo piston pin retainer ring (4).
6. Install the manual 2-1 band servo piston cushion spring (2).
Important: Make certain that the tapered end of the manual 2-1 band servo piston pin contacts the manual 2-1 band.
7. Install the manual 2-1 band servo piston assembly (1).