Savana 3/4 Ton Van V6-4.3L VIN W (1998)
10. Pull the cooler line straight out from the quick connect fitting.
11. Remove the retaining ring (E-clips) securing the cooler line to the quick connect in order to remove the remaining cooler lines from the remaining
quick connect fittings.
12. Remove the cooler lines from the vehicle.
INSTALLATION PROCEDURE
1. Install the transmission oil cooler line to the vehicle. (7.4L engine)
2. Install the transmission oil cooler line to the vehicle. (6.5L diesel engine)
IMPORTANT: Do not reuse any of the existing retaining rings that were removed from the existing quick connect fittings. All retaining rings
being installed must be New.
3. Install the new retaining ring (E-clip) into the quick connect fitting.