Savana 3/4 Ton Van V8-6.5L DSL Turbo VIN F (2001)
1. Install the relay to the studs on the engine.
NOTE: Refer to Fastener Notice in Service Precautions.
2. Install the relay mounting nuts.
Tighten
Tighten the nuts to 42 N.m (31 lb ft).
3. Install the wiring harness connector to the relay.
4. Install the glow plug feed wires.
5. Install the glow plug feed wires nuts.
Tighten
Tighten the nuts to 4.5 N.m (44 lb in).
IMPORTANT: Ensure that the PCM electrical harness is properly routed to avoid contact with the engine cover during installation.