Sierra 1500 2WD V8-5.3L (2008)
6. Position the starter solenoid cable clip to the frame and install the starter solenoid cable clip bolt (2).
Tighten the bolt to 10 N.m (89 lb in).
7. Install the engine wiring harness lead terminal (2) to the starter.
8. Install the engine wiring harness lead nut (1).
Tighten the nut to 3.4 N.m (30 lb in).