Sierra 1500 4WD V8-6.0L VIN U (2006)
3. If equipped with RPO HP2, position the cable (w/bracket) and install the 3-phase cable bracket to the studs.
4. Install the 3-phase cable bracket nuts (2).
Tighten the nuts to 15 N.m (11 lb ft).
5. If equipped with RPO HP2, install the 3-phase cable to the SGCM.
6. Install the 3-phase cable nuts to the SGCM.
Tighten the nuts to 9 N.m (80 lb in).
7. Install the SGCM cover and bolts.
Tighten the bolts to 9 N.m (80 lb in).