gmc Workshop Repair Guides

GMC Workshop Service and Repair Manuals

EGR Valve Actuator > < Emissions - EGR Valve Motor Availability/Service|Page 11101
Page 2
background image

1. Position a NEW EGR valve to valve cooler gasket to the valve cooler.
2. Position the EGR valve (3) to the valve cooler.

Notice:  Refer to Fastener Notice.

3. Install the EGR valve bolts (2).

Tighten the bolts to 25 N.m (18 lb ft).

4. Install NEW EGR valve gaskets (1) onto the EGR valve, if required.
5. Install the EGR valve cooler.

EGR Valve Actuator > < Emissions - EGR Valve Motor Availability/Service|Page 11101