Typhoon V6-262 4.3L Turbo (1993)
7. Clutch spacer shims (3).
8. Use the originals if possible to give the same gap.
9. New felt ring.
-
If the clutch was not disassembled, reinstall the clutch front plate.
7. Clutch spacer shims (3).
8. Use the originals if possible to give the same gap.
9. New felt ring.
-
If the clutch was not disassembled, reinstall the clutch front plate.