Typhoon V6-262 4.3L Turbo (1993)
![background image](/gmc/typhoon/v6-262_4.3l_turbo/Page-906003.png)
12. Screws (38).
13. Case sections (30 and 36).
14. Core (33).
Install Or Connect
1. Core (33).
-
Add or replace Refrigerant Oil as necessary.
2. Case sections (30 and 36).
3. Screws (38).
4. Accumulator (6).
5. Blower assembly to the vehicle.
6. Screws (29) and nuts (37).
Tighten
-
Screws (29) to 3 Nm (27 in. lb.).
-
Nuts (37) to 2 Nm (18 in. lb.).
7. Compressor hose assembly (3) to accumulator.
8. Evaporator tube (5) to evaporator (10).
Tighten
-
Evaporator tube connection to 41 Nm (30 ft. lb.).
-
Compressor hose assembly to 41 Nm (30 ft. lb.).
9. Electrical connectors, as necessary.
10. Resistor (35).
11. Heater hoses to core.
12. Charge air cooler.
13. Refill cooling system.
14. Refrigerant to the system.
-
Check the system for leaks.