V 3500 P/U 4WD V8-350 5.7L VIN M 4-bbl (1987)
Figure No. 2 (LH)
3.
Remove existing nuts (3), washers (2), and bolts (8). DISCARD. Refer to Figure 2 LH.
4.
Weld crack using welding procedure, if necessary.
Figure No. 3 (LH)
5.
Position bracket (6) on top flange area of frame rail. Refer to Figure 3 LH.
6.
Install new bolts (8), washers (2), and nuts (3). Torque nuts (3) to 55-75 N-m (41-55 lbs.ft). Refer to Figure 3 LH.
7.
Using bracket (6) as a template, drill through top of frame rail at holes A and B with 13/32" diameter high speed drill. A right angle drive is
suggested. Refer to Figure 3 LH.