gmc Workshop Repair Guides

GMC Workshop Service and Repair Manuals

Procedures|Page 6299 > < Procedures|Page 6297
Page 4
background image

5. Install the starter solenoid cable terminal (2) to the fuse stud.
6. Install the starter solenoid cable nut (1) to the fuse stud.

Tighten the nut to 15 Nm (11 lb ft).

7. Install the fuse cover.
8. Connect the negative battery cable. Refer to Battery Negative Cable Disconnection and Connection   See: Battery/Battery Cable/Negative/Service

and Repair/Battery Negative Cable Disconnection and Connection.

200 Amp Mega Fuse and Auxiliary Electrical Center 12VDC Junction Block Replacement

200 Amp Mega Fuse and Auxiliary Electrical Center 12VDC Junction Block Replacement

Procedures|Page 6299 > < Procedures|Page 6297