Accord L4-2.4L (2005)
![background image](/honda/accord/l4-2.4l/Page-750002.png)
14. Apply liquid gasket, P/N 08717-0004, 08718-0001, 08718-0002, 08718-0003, or 08718-0009, evenly to the cylinder block mating surface of the
water passage and to the inner threads of the bolt holes.
NOTE:
^
Do not install components if too much time has passed after applying the liquid gasket (for P/N 08718-0002, no more than 4 minutes, for all
others, no more than 5 minutes). Instead, remove the old residue and reapply the liquid gasket.
^
Do not run the engine for at least 3 hours after installing the water passage.
15. Install the water pump.
16. Install the thermostat housing (A) with a new O-ring (B).
17. Install the water passage (C) with a new O-ring (D).
18. Install the connecting pipe (A) with a new O-ring (B).
19. Install the water bypass hose (C), and PCV hose (D), then tighten a bolt (E) securing the connecting pipe.
20. Install the intake manifold.