Accord L4-2.4L (2005)
![background image](/honda/accord/l4-2.4l/Page-1537002.png)
11. Remove the ATF dipstick, and remove the bolts securing the ATF cooler inlet line brackets (A) and ATF dipstick guide pipe (B) from the
transmission hanger (C).
12. Remove the harness clamp (D), then remove the ATF dipstick guide pipe.
13. Remove the shift solenoid valve cover (A), dowel pins (B), and gasket (C).
14. Disconnect the shift solenoid valve connectors, remove the solenoid mounting bolts, then hold the solenoid valve body and remove the shift
valves. Do not hold the connector to remove the shift solenoid valve.
15. Install the new O-rings (two O-rings per solenoid valve) (F) on the reused solenoid valve.
NOTE: A new solenoid valve comes with new O-rings. If you install a new solenoid valve, use the O-rings. provided on it.