honda Workshop Repair Guides

Honda Workshop Service and Repair Manuals

Power Steering|Page 5250 > < Power Steering|Page 5248
Page 11
background image

12.

Remove O-ring from 4-way control valve.

13.

Check plungers for any scoring or scratches, then slip each plunger into the valve body and ensure that it slides smoothly, without drag or side
play.

14.

Check 4-way control valve for any scoring or scratches, then slip each 4-way control valve into the valve body and ensure that it slides smoothly,
without drag or side play.

ASSEMBLE

1.

Thoroughly clean all disassembled parts, then coat plungers, cut-off valve and 4-way control valve surfaces with power steering fluid.

2.

Coat )-ring with grease, then install it on the 4-way control valve.

3.

Install 4-way control valve, plungers, return springs and rollers into valve body.

4.

Install new pinion dust seal in control valve body unit.

5.

Coat O-ring and port seal with grease and install them into port housing.

6.

Install dowel pins and valve body on port housing.

7.

Install cut-off valve spring and cut-off valve.

8.

Coat cap seal with grease and install valve body cap.

9.

Install flange bolts into control valve body unit, torque to 9 ft. lbs.

10.

Ensure control valve moves smoothly and returns to neutral position.

11.

Coat O-rings and pinion holder pin with grease, then install them with the port orifices.

Fig. 7  Installing Control Valve Body Unit Onto Gear Housing

12.

Apply vinyl tape onto pinion shaft and coat tape with grease, Fig. 7.

13.

Install valve body unit onto gear housing, torque bolts to 8 ft. lbs.

14.

Remove vinyl tape from pinion shaft.

Power Steering|Page 5250 > < Power Steering|Page 5248