hyundai Workshop Repair Guides

Hyundai Workshop Service and Repair Manuals

Evaporative Check Valve|Service and Repair > < Evaporative Check Valve|Locations|Page 4878
Page 1
background image

Evaporative Check Valve: Testing and Inspection

Overfill Limiter (Two-way Valve) Operation

To test the two way valve for proper operation:

1. 

Remove the overfill limiter mounting bolt.

2. 

Disconnect the vapor hoses, and then remove the over fill limiter.

3. 

Blow lightly into the inlet and the outlet. If air passes through after a slight resistance, then the valve is good.

Evaporative Check Valve|Service and Repair > < Evaporative Check Valve|Locations|Page 4878