hyundai Workshop Repair Guides

Hyundai Workshop Service and Repair Manuals

Emission Control System|Page 5518 > < Canister Purge Solenoid|Specifications|Page 5515
Page 1
background image

Canister Purge Solenoid: Testing and Inspection
Emission Control System

PURGE CONTROL SOLENOID VALVE (PCSV)

INSPECTION

NOTE:  When disconnecting the vacuum hose, make an identification mark on it so that it can be reconnected to its original position. 

1. Disconnect the vacuum hose from the solenoid valve. 
2. Detach the harness connector. 
3. Connect a vacuum pump to the nipple which is connected to intake manifold. 
4. Apply vacuum and check when voltage is applied to, the PCSV and when the voltage is discontinued.

Battery voltage

Normal condition

When applied

Vacuum is released

When discontinued

Vacuum is maintained

5. Measure the resistance between the terminals of the solenoid valve.

PCSV coil resistance(ohm) : 19.0 - 22.0 ohms at 20 °C (68 °F)

Emission Control System|Page 5518 > < Canister Purge Solenoid|Specifications|Page 5515