infiniti Workshop Repair Guides

Infiniti Workshop Service and Repair Manuals

Engine Controls - MIL ON/DTC's P1031/P1051/P1148/P1168|Page 8510 > < Engine Controls - MIL ON/DTC's P1031/P1051/P1148/P1168|Page 8508
Page 5
background image

5.

Click on Continue and follow directions to perform data transfer (download) from ASIST into CONSULT-II.

Step Two: Preparation for Reprogramming ECM

1.

Connect a battery charger to the vehicle's battery. Set the charger to a low charge rate (trickle charge).

CAUTION: 

For number 2 below and number 3, DO NOT connect the CONSULT-II A/C Power Supply.

2.

Press [SUB MODE] (see Figure C) then:

a.

From the listed items find and select [BATTERY CHARGE].

Engine Controls - MIL ON/DTC's P1031/P1051/P1148/P1168|Page 8510 > < Engine Controls - MIL ON/DTC's P1031/P1051/P1148/P1168|Page 8508