infiniti Workshop Repair Guides

Infiniti Workshop Service and Repair Manuals

Timing Chain|Service and Repair|Page 1875 > < Timing Chain|Service and Repair|Page 1873
Page 17
background image

a. Install new seal rings (1) in shaft grooves.

A: Bank 2

CAUTION:
When replacing seal ring, replace all rings with new ones.

NOTE:
The figure shows an example of bank 2.

b. Install intake valve timing control cover with new gasket to front timing chain case.

CAUTION:
^

Align the center of both shaft holes of the shaft and the intake side camshaft sprocket, and then insert them.

^

Be careful not to drop the seal ring from the shaft groove.

c. Being careful not to move seal ring from the installation groove, align dowel pins on front timing chain case with dowel pin holes (C) to install

intake valve timing control covers.

A: Bank 1
B: Bank 2

d. Tighten mounting bolts in numerical order as shown in the figure.

^

After all bolts are tightened, tighten No.1 bolt to the specified torque again.

11. Install oil pan (lower). 
12. Install rocker covers (bank 1 and bank 2). 
13. Install crankshaft pulley as follows:

a. Fix crankshaft using the ring gear stopper [SST: KV10118600 (J-48641)].
b. Install crankshaft pulley, taking care not to damage front oil seal.

^

When press-fitting crankshaft pulley with plastic hammer, tap on its center portion (not circumference).

c. Tighten crankshaft pulley bolt.

Torque: 44.1 Nm (4.5 kg-m, 33 ft-lb)

Timing Chain|Service and Repair|Page 1875 > < Timing Chain|Service and Repair|Page 1873