G37 Coupe V6-3.7L (VQ37VHR) (2008)
Neutral Safety Switch: Testing and Inspection
Component Parts Location
Component Inspection
1.CHECK PARK/NEUTRAL POSITION (PNP) SWITCH
Check continuity between park/neutral position (PNP) switch terminals with control lever turned to 1st to 6th and reverse position.
Is the inspection result normal?
YES >> INSPECTION END
NO >>
Replace park/neutral position (PNP) switch.