infiniti Workshop Repair Guides

Infiniti Workshop Service and Repair Manuals

Front Suspension|Page 6698 > < Front Suspension|Page 6696
Page 6
background image

Exploded View FSU-26 (Part 2)

UPPER LINK 

Removal and Installation 

REMOVAL 

1. Remove tires from vehicle with a power tool.
2. Remove shock absorber. 
3. Remove mounting nut and bolt with a power tool, and then remove upper link from steering knuckle.
4. Remove mounting nuts and bolts, and then remove upper link and stopper rubber from vehicle. 

INSPECTION AFTER REMOVAL 

Visual Inspection 

Check the following:
^

Upper link and bushing for deformation, cracks or damage. Replace it if a malfunction is detected.

^

Ball joint boot for cracks or other damage, and also for grease leakage. Replace it if a malfunction is detected.

Ball Joint Inspection 

Manually move ball stud to confirm it moves smoothly with no binding. 

Swing Torque Inspection 

NOTE:  Before measurement, move ball stud at least ten times by hand to check for smooth movement.

^

Hook a spring balance at cutout on ball stud. Confirm spring balance measurement value is within specifications when ball stud begins moving.
Swing torque: 0 - 2.0 Nm (0 - 0.2 kg-m, 0 - 17 in-lb) 
Spring balance measurement: 0 - 61.5 N (0 - 6.2 kg, 0 - 13.6 lb) 

^

If it is outside the specified range, replace upper link assembly.

Rotating Torque Inspection 

Front Suspension|Page 6698 > < Front Suspension|Page 6696